Home | About Us | Certificates | Catalog | Solution | Contact Us | Quality Control  
 
Stamped parts
Die casted parts
Lathe machined parts
Deep drawn parts
Milled Parts
Die Spun Parts
Electroplated parts
Power coated parts
Plastic injected parts
Sheet metal stamping
Metal welding
Moulds building
Metal extruding
Aluminum die casting
Metal Machining
Metal finishing
Metal bending
Plastic injection molding
Plastic injected parts

 Plastic boxes                                                                           

              

           Tool box                                   Jewelry box                      Machine box

          

     Mini-Refrigerator                    Radio box                         TK97 box

The mould tooling lead time is aobut 30~45 days. The mass production for 50k is about 2 weeks. we also provide second operation for surface treaiting like painting, coating ect. Before tooling, we can do prototyping, so you can check if the product function well.

  

 
CopyRight©2020 湖南龙励电气有限公司 湘ICP备19002922号-1 91430121399123079L